Generator Sizing: kVA to kW and How to Size a Set for a Commercial Site
Author
Hisham Abdalla
Date Published

Disclaimer: Research and analysis by the engineering team. Final selection of a set belongs with the manufacturer's sizing data for the exact model and site. Sources referenced below.
To convert kVA to kW, multiply by the power factor: kW = kVA x power factor. Generator sets are normally rated at 0.8, so a 500 kVA set delivers 500 x 0.8 = 400 kW, and a 400 kW load needs 400 / 0.8 = 500 kVA. Generator sizing for a commercial or industrial site then comes down to a load list, the biggest motor start, any non-linear loads, the rating class, the site derate and a floor under the load so the engine is not starved.
This article takes those in order and finishes with one worked example. It is written for sites that run machinery, pumps and process plant, not for a house backup unit.
kVA vs kW: What the Power Factor Does
kVA is apparent power, voltage times current. kW is the real power that does work. Power factor is the ratio, kW divided by kVA. Kohler notes that three-phase generator sets are usually rated in kVA at 0.8 power factor (Kohler, Sizing Generators for Motor Starting), and one Detroit Diesel/MTU sheet states it outright for all its three-phase units (1000DSEC sheet).
The engine limits the kW. The alternator limits the kVA. A set reaches whichever comes first.
Take a set rated 455 kVA, 364 kW prime, which is 455 x 0.8 = 364. At 0.8 the two limits meet. A load at 0.9 power factor draws 364 / 0.9 = 404 kVA at full engine power, so the engine runs out first. A load at 0.7 reaches the alternator limit first, at 455 x 0.7 = 318.5 kW, while the engine still has spare. Lightly loaded motors and transformers push the power factor down, so check it on your real load.
Cables and breakers also see kVA, not kW. The current of a three-phase supply is kVA x 1,000 / (1.732 x volts), so 455 kVA at 400 V is 455,000 / (1.732 x 400) = 657 A.

kW = kVA x power factor, shown for a 455 kVA, 364 kW prime set. Source: MIMAH engineering practice; Kohler and MTU data sheet for the 0.8 rating basis.
Start With a Load List
Do not size from a rule of thumb or an online calculator alone. Write down every load: rated kW, power factor, how it starts, the hours it runs and which loads run together. For motors, electrical demand is the shaft rating divided by efficiency.
Two totals come out. The peak running load, everything that can run at once, sets the kW the set must carry. The average over 24 hours sets the loading the engine will live at. They answer different questions, and the rating class in the next sections depends on the second.
Add a growth allowance you will really use, not a blanket margin. A set sized far above its real load carries a fuel and wear penalty for years, as the section on minimum load explains.
Why the Biggest Motor Often Sizes the Set
A motor started direct on line draws about six times its full load current, and the generator sees a large, low power factor demand that drags the voltage down. Kohler gives the method, which we work through with a 300 kW pump motor in our article on black start generators: find the motor's NEMA code letter, take locked rotor kVA per horsepower (5.6 to 6.3 for motors of 15 hp and up), and cut by the square of the voltage you can tolerate. An IEC motor carries no code letter, so take its locked rotor current from the motor data sheet instead.
Apply it here. Suppose the largest motor on a site is rated 90 kW, which is 90 / 0.746 = 121 hp. At 5.6 to 6.3 kVA per horsepower, direct on line starting demands 121 x 5.6 = 678 kVA up to 121 x 6.3 = 762 kVA at full voltage. Accepting a 30 percent dip multiplies that by 0.7 x 0.7 = 0.49, which is 332 to 373 kVA.
Do not read that straight against the nameplate of a 330 kW set (330 / 0.8 = 412.5 kVA). Kohler says a typical set can produce nearly twice its continuous kVA at the 0.4 power factor of a starting motor, so matching locked rotor kVA one for one can double the size of the set. The figure to compare is the maker's motor starting kVA at your allowed dip, with the load already running counted in.
Three things change the answer.
The starter. Kohler quotes autotransformer taps of 80, 65 or 50 percent of line voltage, with starting torque falling to 64, 42 or 25 percent. At the 65 percent tap the line demand falls to 0.65 x 0.65 = 0.4225 of the full voltage figure, so our motor's 678 to 762 kVA becomes 286 to 322 kVA, before any allowance for dip. Kohler advises the 80 or 65 percent taps, and says only closed transition starters help on a generator, because an open transition starter puts a spike of kVA on the set as it changes step. A soft starter is a common choice, though it distorts the voltage during the start.
The excitation system. An Atlas Copco sizing guide notes that a self-excited shunt system has only 180 percent overload capability, whereas a PMG or AREP system has 300 percent for up to 10 seconds (Atlas Copco guide). For motor duty that can allow a smaller set.
The load already running. Kohler says a set at 50 percent load may dip about 2 percent more than its published figure, and the order in which motors start matters. Compare the manufacturer's motor starting data, and its load step acceptance class under ISO 8528, with your largest single step.
Soft Starters, Drives and Non-Linear Loads
A drive removes the starting surge but adds harmonic current. Kohler's paper on nonlinear loads treats generator sizing as three checks: voltage and frequency drop, motor starting, and harmonic distortion (Kohler, Managing Emergency Generators With Nonlinear Loads). It shows how a six-pulse UPS with 28.9 percent current distortion can produce 15.4 percent voltage distortion even when it is only half of the alternator capacity. The usual remedy is an alternator with low subtransient reactance, which is a larger, dearer machine.
In one of its case studies, a 300 kW mixed load contains a 222 kW motor. Starting across the line needed a 700 kW set. With a VFD, the set came down to 500 kW, at 9.23 percent voltage distortion. The trade is real in both directions: a drive shrinks the set for starting and grows the harmonics problem. If a site has UPS units, drives, battery chargers or LED lighting banks, tell the supplier, because the alternator may need to be bigger than the engine suggests.
Standby, Prime or Continuous: Which Rating to Size Against
Every set has several ratings at one engine size. A Cummins presentation of ISO 8528-1 sets them out (Understanding ISO 8528 Generator Set Ratings).
Emergency standby (ESP). For covering a utility failure, up to 200 hours a year, at an average load of no more than 70 percent of the standby rating over 24 hours.
Limited time running (LTP). Up to 500 hours a year at a constant load, no overload.
Prime (PRP). Unlimited hours at variable load, with an average of no more than 70 percent of the prime rating over any 24 hours.
Continuous (COP). Unlimited hours at a constant load up to 100 percent, with no overload.
The same engine therefore has different kW numbers. The Cummins C500 D5 data sheet lists 500 kVA (400 kW) standby against 455 kVA (364 kW) prime, as we noted in the fuel consumption article. A site that runs its generators for thousands of hours should size on prime or continuous, whatever the brochure headline says. Our maintenance schedule explains why a standby rated set running as prime power needs a different regime.

The four ISO 8528-1 rating classes as presented by Cummins. The same engine carries a different kW in each. Source: Cummins, Understanding ISO 8528 Generator Set Ratings, 2017.
Derating for Heat and Altitude
Hot, thin air reduces engine power, and a published rating assumes reference conditions. Manufacturers publish their own derate figures, and they differ. A 2006 Detroit Diesel/MTU sheet for a 1,000 kW, 60 Hz set gives general guidelines of 1.0 percent per 100 m above 400 m of elevation and 3.0 percent per 5 degrees C above 40 degrees C (1000DSEC sheet). Use your own set's derate data sheet, not these. The Cummins C500 D5 sheet, for one, points to a separate derate sheet for that model.
Suppose a site at 1,000 m with ambient reaching 45 degrees C, using those factors for illustration. Altitude takes (1,000 - 400) / 100 = 6 percent and temperature takes (45 - 40) / 5 = 1 step of 3 percent. The sheet does not say how to combine them, so we multiply: 0.94 x 0.97 = 0.912. A set with a published 364 kW prime rating delivers about 364 x 0.912 = 332 kW there.
Also check what the headline rating includes. The Cummins presentation warns that not every maker's rating includes parasitic losses such as cooling fans. Its example is a published 3,350 kW with 100 kW of parasitic losses, so 3,250 kW reaches the customer.
Minimum Load: Why Oversizing Hurts
A set that is too big for its load costs money in three ways. It burns more fuel per kWh, as our fuel article shows (the C500 D5 uses 40 percent more per kWh at a quarter load than at full load). It carries the same maintenance cost over fewer kWh. And it suffers wet stacking, the carbon and unburned fuel that build up in the exhaust when a diesel runs light for long periods.
Atlas Copco defines low load as under 30 percent of capacity and advises sizing for an average load above that, or using a power management system, artificial load or a hybrid arrangement with storage to avoid it. Our guide to load bank testing explains how to load a set that cannot reach this naturally.
One Set or Two in Parallel?
Two sets in parallel can follow the load: one runs at night, two at the peak, and each stays in a healthy loading range. A fault or a service takes out half the capacity instead of all of it. The costs are paralleling switchgear, load sharing controls and one more engine to maintain. The synchronising logic is the same kind described in our black start article. Parallel sets also only give true redundancy if the remaining set can carry the essential load alone.
A Worked Example for a Commercial Site
Take a packing plant, as a hypothetical. The peak running load is 300 kW, the average over 24 hours is 210 kW, the quiet night load is 100 kW, and the largest motor is the 90 kW unit above. Site conditions are 1,000 m and 45 degrees C.
Growth. A 10 percent allowance, chosen for the example, gives 300 x 1.10 = 330 kW at site.
Derate. With the 0.912 factor, the catalogue prime rating must be at least 330 / 0.912 = 362 kW. A 364 kW prime set, which is 455 kVA, passes.
Average load. 210 / 364 = 58 percent of the prime rating, inside the 70 percent limit. After derate, 210 / 332 = 63 percent.
kVA check. If the 330 kW runs at 0.85 power factor, it draws 330 / 0.85 = 388 kVA. That is inside the 455 kVA alternator, and inside the 415 kVA left if the same 0.912 factor applies to it (455 x 0.912 = 415).
Motor start. Direct on line, the 90 kW motor needs 332 to 373 kVA at a 30 percent dip, on top of the load already running. Check that against the manufacturer's motor starting kVA for this set, and fit a closed transition autotransformer or a soft starter if it falls short.
Night load. 100 / 364 = 27 percent of the catalogue rating, and 100 / 332 = 30 percent of the derated rating, so the set sits on the 30 percent line all night. Two 182 kW prime sets in parallel give the same total. Each derates to 182 x 0.912 = 166 kW, so they carry the peak at 300 / 332 = 90 percent each, and one alone carries the night at 100 / 166 = 60 percent. The 90 kW motor should then start only with both sets on the bar.

A hypothetical sizing check for a packing plant with a 300 kW peak, 210 kW average and 100 kW night load. Source: MIMAH engineering practice; Kohler motor starting method; Detroit Diesel/MTU sheet derate guidelines.
That result is a first pass. The manufacturer's sizing software, run with the real motor list and starters, gives the answer for the exact model.
Before You Request Quotes
Send suppliers the load list with start methods, the rating class and annual hours, the site altitude and peak ambient temperature, voltage and phases, the dip you can tolerate, and any drives, UPS or chargers. Ask each for motor starting kVA at your dip and its derate data for your site. Without those, two quotes for the "same" size are not comparable.
MIMAH's industrial engineering team can review a load list and sizing as part of a technical audit or feasibility study. If you have a set that struggles to start a motor, or a site where the generator never gets above a third of its rating, get in touch.